Project Insight: Braden

We are progressing well through our Standby Generator Replacement Programme on behalf of our main client, Scottish Water.

There are 2no large generators to be replaced on this project. Both generators are large complex pieces of equipment that have been carefully specified to meet our clients needs/ requirements. The water treatment works at Braden provides water supply to large portions of Ayrshire and the consistency of this supply is the key goal for our client.

After a period of enabling works on-site, including clearing of the old generator concrete slabs and preparing additional foundation work for the new generator, the first generator has been supplied and installed. Our team are currently modifying the existing concrete base, in preparation for the installation the second generator.

Once our second generator has been commissioned, our team will remove the existing temporary generators leaving permanent protection of supply for the client.